| Sector | abcSecurity Services | Tender Value | INR 4.82 Crore | Location | Tamil Nadu - India | Ref.No | 86790204 | Closing Date | 25 - Sep - 2025 | | | Provision Of STP for Ava Hill Complex And Mandir Line Complex At Wellington Under Ge Wellington ,2.0 ,Lumpsum Price Worked Out By The Tenderer For Building / Structures As Listed In Schedule 'A' Part-I ,Lumpsum Price Worked Out By The Tenderer For Site Clearance And Area Development As Listed In Schedule 'A' Part-Ii ,Lumpsum Price Worked Out By The Tenderer For Internal Water Supply As Listed In Schedule 'A' Part-Iii ,Lumpsum Price Worked Out By The Tenderer For Internal Electric Supply As Listed In Schedule 'A' Part-Iv ,Lumpsum Price Worked Out By The Tenderer For Protective Work As Listed In Schedule 'A' Part-V ,Lumpsum Price Worked Out By The Tenderer For Road/ Culvert As Listed In Schedule 'A' Part-Vi ,Lumpsum Price Worked Out By The Tenderer For Sewage Disposal As Listed In Schedule 'A' Part-Vii ,Lumpsum Price Worked Out By The Tenderer For Area Drainage As Listed In Schedule 'A' Part-Viii ,Lumpsum Price Worked Out By The Tenderer For Fencing & Gate As Listed In Schedule 'A' Part-Ix ,Lumpsum Price Worked Out By The Tenderer For External Water Supply As Listed In Schedule 'A' Part-X ,Lumpsum Price Worked Out By The Tenderer For External Electric Supply As Listed In Schedule 'A' Part-Xi ,Note 1. Schedule ‘A’ Part - I Here-In-Before Is Not Prepriced By Mes And Left Blank Under Col. 5 Signifies This Fact Only. Bidder Shall Insert Their Rates In Green Colour Filled Under Col-6. 2. Schedule ‘A’ Part - Ii To Xi Here-In-Before Are Prepriced By Mes Under Ser No. 2.00 To 11.00 Bidders Shall Insert Their Lumpsum Amount In The Green Coloured Field Under Col-6 Only. 3. Schedule ‘A’ Part - Xii (Stp & Miscellaneous Items) Hereinafter Is Not Prepriced By Mes And Prepriced By Mes And Rate Left Blank Under Col.5 Signifies This Fact Only. Bidder Shall Insert Their Rates In Green Colour Filled Under Col-6. ,Schedule ‘A’ Part - Xii (Stp & Miscellaneous Items) ,Sewage Treatment Plant (Stp) At Ava Hill Designing (Hydraulically, Structurally & Aesthetically), Providing, Constructing, Hydraulic Testing, Commissioning And Giving Satisfactory Trials Of Stp Of Capacity 75 Cum/Day (Kld) Consisting Of Inlet Chamber(Rcc), Fine Bar Screen Chamber (Manual) Rcc With Steel Screen, Oil & Grease Remover (Rcc), Grit Separator, Equalization Tank (2 Tanks Of 50% Capacity Each), Air Grid For Equalization Tanks, Feed Pumps (2 No), Moving Bed Bio Reactor(S) With Plastic Media (Of Appropriate Density, Size And Quantity To Keep Very High Mlss > 15,000 Mg/Lit), Air Blowers For Mbbr, Tube Settler Assembly, Sludge Drying Bed Of Appropriate Size, Chlorine Dozing System, Chlorine Contact Tank, Foundation For All E/M Equipments, Associated Piping Work With Required Valves, Gates, Drains, Pathways, Electrical Control Panel With Interconnecting Cable, Spare Parts For 2 Years Of Operation, Etc. Complete As Turnkey Job With All Involved Civil, Electrical, Digital And Mechanical Works As Per Detailed Specifications For Civil, Electrical And Mechanical Components With All Duties And Taxes Complete. (Also Refer Imp Notes Below). For Tertiary Treatment It Also Includes Filter Feed Tank Of Rcc, Filter Feed Pumps, Dual Media Filter, Activated Carbon Filter, Treated Water Tank In Rcc. Treated Sewage Can Be Used For Irrigation, Horticulture, Fire Fighting And Mt Wash Complete All As Directed. ,Sewage Treatment Plant (Stp) At Mandir View Designing (Hydraulically, Structurally & Aesthetically), Providing, Constructing, Hydraulic Testing, Commissioning And Giving Satisfactory Trials Of Stp Of Capacity 65 Cum/Day(Kld) Consisting Of Inlet Chamber(Rcc), Fine Bar Screen Chamber(Manual) Rcc With Steel Screen, Oil & Grease Remover(Rcc), Grit Separator, Equalization Tank( 2 Tanks Of 50% Capacity Each), Air Grid For Equalization Tanks, Feed Pumps(2 No), Moving Bed Bio Reactor(S) With Plastic Media (Of Appropriate Density, Size And Quantity To Keep Very High Mlss > 15,000 Mg/Lit), Air Blowers For Mbbr, Tube Settler Assembly, Sludge Drying Bed Of Appropriate Size, Chlorine Dozing System, Chlorine Contact Tank, Foundation For All E/M Equipments, Associated Piping Work With Required Valves, Gates, Drains, Pathways, Electrical Control Panel With Interconnecting Cable, Spare Parts For 2 Years Of Operation, Etc. Complete As Turnkey Job With All Involved Civil, Electrical, Digital And Mechanical Works As Per Detailed Specifications For Civil, Electrical And Mechanical Components With All Duties And Taxes Complete. (Also Refer Imp Notes Below). For Tertiary Treatment It Also Includes Filter Feed Tank Of Rcc, Filter Feed Pumps, Dual Media Filter, Activated Carbon Filter, Treated Water Tank In Rcc. Treated Sewage Can Be Used For Irrigation, Horticulture, Fire Fighting And Mt Wash Complete All As Directed. ,Designing (Hydraulically, Structurally And Aesthetically), And Constructing Rcc Sumps In M-30 Mix Of Required Capacity Including Excavation In All Types Of Strata, Foundation Concrete, Container Walls, Bottom Slab, Top Rcc Roof Slab With Ci Manhole Covers And With Plaster And Water |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|