|
Product Detail :
|
Providing vertical extension (3rd floor) over existing building for EPFO at Guntur. SH Construction of 3rd floor, replacement of damaged/wornout windows for the existing 3 floors (G 2), UG Sump of 1,00,000 litre and fire escape staircase (Steel structure) including IEI and Fans, Lifts, CCTV, LAN Networking, VRF/ VRV/UPS, Fire Fighting System, Addressable type automatic fire alarm system, Boom barrier etc. . * subwork
|