Product Detail :
|
Providing and Laying Waterproofing Treatment for 25.00m Lvl Floor of 3-4 and Other Areas at Kltps. Work of Maintenance & Repairing of Fire Line Protection System of Unit 3 & 4 on As-&-when Required Basis at Kltps. Application of Refractory Material for Cfbc Boiler Unit 4 at Kltps and as & When Required for 12 Months Period.
|